Salix carbon reporting after PSDS completion

Post-completion reporting tracks measured kgCO2e displaced against the bid. Salix uses it to verify VfM at scheme level and to feed DESNZ aggregate numbers [Salix].

Oliver Wakefield-Smith
Founder · Digital Signet
Verified for Phase 4 / Phase 5 watch · refresh expected on Phase 5 window opening
Primary source · Salix Finance PSDS portal salixfinance.co.uk/PSDS last verified 22 Jun 2026

What Salix requires

Metering and sub-metering at handover

Without sub-metering it is impossible to attribute measured savings to the funded measure. BMS upgrades that incorporate sub-metering pay for themselves at this stage [Salix].

Material undershoot

Material undershoot triggers a clawback conversation. Salix focuses on systematic vs random variance: if the measured number is consistently below model, look at SCOP, fabric, or commissioning. If it is volatile, look at metering.