Services on PSDS
- Pre-feasibility carbon baselining.
- Lifetime kgCO2e modelling and Grant Carbon Cost calculation.
- Salix-portal application compliance review.
- Post-award carbon reporting against the bid.
Track record
School and FE cohorts across multiple regions; LA estate-wide PSDS programmes.
Engagement structure
Typical structure: discrete pre-feasibility carbon-baselining piece, feasibility-stage GCC modelling, then ongoing reporting support post-award. Often paired with an engineering consultant (e.g. Ridge) for the heat-loss model.